- What technologies are you going to be using to deploy the operating system and are those technologies included with the blade servers themselves
- How do you plan to use these blades with your existing environment, integrated or non integrated switches, 10GB Ethernet or normal Ethernet to work with your existing infrastructure
- Think about the power load and cooling required in terms of density, how this affects your data center air flow and power
- Managing servers in volume, managing 4 rack servers is one thing, managing 48 blades is another, in terms of asset management, rebuilds and support – what procedures need put in place, enclosure management etc. As we move to dynamic provisioning, where I can rebuild a server in 30 minutes, how do we manage the needs of the end user to have control with our own internal billing and systems management requirements?